summaryrefslogtreecommitdiff
path: root/testgdate.c
diff options
context:
space:
mode:
authorOwen Taylor <otaylor@redhat.com>2001-06-26 16:01:21 +0000
committerOwen Taylor <otaylor@src.gnome.org>2001-06-26 16:01:21 +0000
commit2fd6b001fb431c274ad6808912ec5fbe831afbef (patch)
tree5d464babd4440b23f10de7aac95ee9e4d8077019 /testgdate.c
parent2c9c0fabc8376a336cde4defa67b9b751954ea87 (diff)
Move glib library into a subdirectory, make all GLib include files include
Tue Jun 26 11:43:46 2001 Owen Taylor <otaylor@redhat.com> * configure.in Makefile.am *.[ch] glib/*.[ch] glib/Makefile.am: Move glib library into a subdirectory, make all GLib include files include as <glib/glist.h> * tests/testglib.c tests/testgdate.c tests/testgdateparser.c tests/timeloop.c tests/timeloop-basic.c: Move all tests into the tests/ subdirectory.
Diffstat (limited to 'testgdate.c')
-rw-r--r--testgdate.c489
1 files changed, 0 insertions, 489 deletions
diff --git a/testgdate.c b/testgdate.c
deleted file mode 100644
index 01365f3f9..000000000
--- a/testgdate.c
+++ /dev/null
@@ -1,489 +0,0 @@
-#ifdef GLIB_COMPILATION
-#undef GLIB_COMPILATION
-#endif
-
-#include "glib.h"
-
-#include <stdio.h>
-#include <string.h>
-#include <locale.h>
-#include <time.h>
-
-gboolean failed = FALSE;
-guint32 passed = 0;
-guint32 notpassed = 0;
-
-#define TEST(m,cond) G_STMT_START { failed = !(cond); \
-if (failed) \
- { ++notpassed; \
- if (!m) \
- g_print ("\n(%s:%d) failed for: %s\n", __FILE__, __LINE__, ( # cond )); \
- else \
- g_print ("\n(%s:%d) failed for: %s: (%s)\n", __FILE__, __LINE__, ( # cond ), (gchar*)m); \
- } \
-else \
- ++passed; \
- if ((passed+notpassed) % 10000 == 0) g_print ("."); fflush (stdout); \
-} G_STMT_END
-
-void g_date_debug_print(GDate* d)
-{
- if (!d) g_print("NULL!\n");
- else
- g_print("julian: %u (%s) DMY: %u %u %u (%s)\n",
- d->julian_days,
- d->julian ? "valid" : "invalid",
- d->day,
- d->month,
- d->year,
- d->dmy ? "valid" : "invalid");
-
- fflush(stdout);
-}
-
-int main(int argc, char** argv)
-{
- GDate* d;
- guint32 j;
- GDateMonth m;
- GDateYear y, prev_y;
- GDateDay day;
- gchar buf[101];
- gchar* loc;
- /* Try to get all the leap year cases. */
- GDateYear check_years[] = {
- 1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
- 11, 12, 13, 14, 98, 99, 100, 101, 102, 103, 397,
- 398, 399, 400, 401, 402, 403, 404, 405, 406,
- 1598, 1599, 1600, 1601, 1602, 1650, 1651,
- 1897, 1898, 1899, 1900, 1901, 1902, 1903,
- 1961, 1962, 1963, 1964, 1965, 1967,
- 1968, 1969, 1970, 1971, 1972, 1973, 1974, 1975, 1976,
- 1977, 1978, 1979, 1980, 1981, 1982, 1983, 1984, 1985,
- 1986, 1987, 1988, 1989, 1990, 1991, 1992, 1993, 1994,
- 1995, 1996, 1997, 1998, 1999, 2000, 2001, 2002, 2003,
- 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012,
- 3000, 3001, 3002, 3998, 3999, 4000, 4001, 4002, 4003
- };
- guint n_check_years = sizeof(check_years)/sizeof(GDateYear);
- guint i;
- gboolean discontinuity;
-
- g_print("checking GDate...");
-
- TEST("sizeof(GDate) is not more than 8 bytes on this platform", sizeof(GDate) < 9);
-
- d = g_date_new();
-
- TEST("Empty constructor produces invalid date", !g_date_valid(d));
-
- g_date_free(d);
-
- d = g_date_new_dmy(1,1,1);
-
- TEST("January 1, Year 1 created and valid", g_date_valid(d));
-
- j = g_date_get_julian(d);
-
- TEST("January 1, Year 1 is Julian date 1", j == 1);
-
- TEST("Returned month is January", g_date_get_month(d) == G_DATE_JANUARY);
- TEST("Returned day is 1", g_date_get_day(d) == 1);
- TEST("Returned year is 1", g_date_get_year(d) == 1);
-
- TEST("Bad month is invalid", !g_date_valid_month(G_DATE_BAD_MONTH));
- TEST("Month 13 is invalid", !g_date_valid_month(13));
- TEST("Bad day is invalid", !g_date_valid_day(G_DATE_BAD_DAY));
- TEST("Day 32 is invalid", !g_date_valid_day(32));
- TEST("Bad year is invalid", !g_date_valid_year(G_DATE_BAD_YEAR));
- TEST("Bad julian is invalid", !g_date_valid_julian(G_DATE_BAD_JULIAN));
- TEST("Bad weekday is invalid", !g_date_valid_weekday(G_DATE_BAD_WEEKDAY));
- TEST("Year 2000 is a leap year", g_date_is_leap_year(2000));
- TEST("Year 1999 is not a leap year", !g_date_is_leap_year(1999));
- TEST("Year 1996 is a leap year", g_date_is_leap_year(1996));
- TEST("Year 1600 is a leap year", g_date_is_leap_year(1600));
- TEST("Year 2100 is not a leap year", !g_date_is_leap_year(2100));
- TEST("Year 1800 is not a leap year", !g_date_is_leap_year(1800));
-
- g_date_free(d);
-
- loc = setlocale(LC_ALL,"");
- if (loc)
- g_print("\nLocale set to %s\n", loc);
- else
- g_print("\nLocale unchanged\n");
-
- d = g_date_new();
- g_date_set_time(d, time(NULL));
- TEST("Today is valid", g_date_valid(d));
-
- g_date_strftime(buf,100,"Today is a %A, %x\n", d);
- g_print("%s", buf);
-
- g_date_set_time(d, 1);
- TEST("Beginning of Unix epoch is valid", g_date_valid(d));
-
- g_date_strftime(buf,100,"1 second into the Unix epoch it was a %A, in the month of %B, %x\n", d);
- g_print("%s", buf);
-
- g_date_set_julian(d, 1);
- TEST("GDate's \"Julian\" epoch's first day is valid", g_date_valid(d));
-
- g_date_strftime(buf,100,"Our \"Julian\" epoch begins on a %A, in the month of %B, %x\n",
- d);
- g_print("%s", buf);
-
- g_date_set_dmy(d, 10, 1, 2000);
-
- g_date_strftime(buf,100,"%x", d);
-
- g_date_set_parse(d, buf);
- /* Note: this test will hopefully work, but no promises. */
- TEST("Successfully parsed a %x-formatted string",
- g_date_valid(d) &&
- g_date_get_month(d) == 1 &&
- g_date_get_day(d) == 10 &&
- g_date_get_year(d) == 2000);
- if (failed)
- g_date_debug_print(d);
-
- g_date_free(d);
-
- j = G_DATE_BAD_JULIAN;
-
- i = 0;
- discontinuity = TRUE;
- y = check_years[0];
- prev_y = G_DATE_BAD_YEAR;
- while (i < n_check_years)
- {
- guint32 first_day_of_year = G_DATE_BAD_JULIAN;
- guint16 days_in_year = g_date_is_leap_year(y) ? 366 : 365;
- guint sunday_week_of_year = 0;
- guint sunday_weeks_in_year = g_date_get_sunday_weeks_in_year(y);
- guint monday_week_of_year = 0;
- guint monday_weeks_in_year = g_date_get_monday_weeks_in_year(y);
-
- if (discontinuity)
- g_print(" (Break in sequence of requested years to check)\n");
-
- g_print("Checking year %u", y);
-
- TEST("Year is valid", g_date_valid_year(y));
-
- TEST("Number of Sunday weeks in year is 52 or 53",
- sunday_weeks_in_year == 52 || sunday_weeks_in_year == 53);
-
- TEST("Number of Monday weeks in year is 52 or 53",
- monday_weeks_in_year == 52 || monday_weeks_in_year == 53);
-
- m = 1;
- while (m < 13)
- {
- guint8 dim = g_date_get_days_in_month(m,y);
- GDate days[31]; /* This is the fast way, no allocation */
-
- TEST("Sensible number of days in month", (dim > 0 && dim < 32));
-
- TEST("Month between 1 and 12 is valid", g_date_valid_month(m));
-
- day = 1;
-
- g_date_clear(days, 31);
-
- while (day <= dim)
- {
- guint i;
- GDate tmp;
-
- TEST("DMY triplet is valid", g_date_valid_dmy(day,m,y));
-
- /* Create GDate with triplet */
-
- d = &days[day-1];
-
- TEST("Cleared day is invalid", !g_date_valid(d));
-
- g_date_set_dmy(d,day,m,y);
-
- TEST("Set day is valid", g_date_valid(d));
-
- if (m == G_DATE_JANUARY && day == 1)
- {
- first_day_of_year = g_date_get_julian(d);
- }
-
- g_assert(first_day_of_year != G_DATE_BAD_JULIAN);
-
- TEST("Date with DMY triplet is valid", g_date_valid(d));
- TEST("Month accessor works", g_date_get_month(d) == m);
- TEST("Year accessor works", g_date_get_year(d) == y);
- TEST("Day of month accessor works", g_date_get_day(d) == day);
-
- TEST("Day of year is consistent with Julian dates",
- ((g_date_get_julian(d) + 1 - first_day_of_year) ==
- (g_date_get_day_of_year(d))));
-
- if (failed)
- {
- g_print("first day: %u this day: %u day of year: %u\n",
- first_day_of_year,
- g_date_get_julian(d),
- g_date_get_day_of_year(d));
- }
-
- if (m == G_DATE_DECEMBER && day == 31)
- {
- TEST("Last day of year equals number of days in year",
- g_date_get_day_of_year(d) == days_in_year);
- if (failed)
- {
- g_print("last day: %u days in year: %u\n",
- g_date_get_day_of_year(d), days_in_year);
- }
- }
-
- TEST("Day of year is not more than number of days in the year",
- g_date_get_day_of_year(d) <= days_in_year);
-
- TEST("Monday week of year is not more than number of weeks in the year",
- g_date_get_monday_week_of_year(d) <= monday_weeks_in_year);
- if (failed)
- {
- g_print("Weeks in year: %u\n", monday_weeks_in_year);
- g_date_debug_print(d);
- }
- TEST("Monday week of year is >= than last week of year",
- g_date_get_monday_week_of_year(d) >= monday_week_of_year);
-
- if (g_date_get_weekday(d) == G_DATE_MONDAY)
- {
-
- TEST("Monday week of year on Monday 1 more than previous day's week of year",
- (g_date_get_monday_week_of_year(d) - monday_week_of_year) == 1);
- }
- else
- {
- TEST("Monday week of year on non-Monday 0 more than previous day's week of year",
- (g_date_get_monday_week_of_year(d) - monday_week_of_year) == 0);
- }
-
-
- monday_week_of_year = g_date_get_monday_week_of_year(d);
-
-
- TEST("Sunday week of year is not more than number of weeks in the year",
- g_date_get_sunday_week_of_year(d) <= sunday_weeks_in_year);
- if (failed)
- {
- g_date_debug_print(d);
- }
- TEST("Sunday week of year is >= than last week of year",
- g_date_get_sunday_week_of_year(d) >= sunday_week_of_year);
-
- if (g_date_get_weekday(d) == G_DATE_SUNDAY)
- {
- TEST("Sunday week of year on Sunday 1 more than previous day's week of year",
- (g_date_get_sunday_week_of_year(d) - sunday_week_of_year) == 1);
- }
- else
- {
- TEST("Sunday week of year on non-Sunday 0 more than previous day's week of year",
- (g_date_get_sunday_week_of_year(d) - sunday_week_of_year) == 0);
- }
-
- sunday_week_of_year = g_date_get_sunday_week_of_year(d);
-
- TEST("Date is equal to itself",
- g_date_compare(d,d) == 0);
-
-
- /*************** Increments ***********/
-
- i = 1;
- while (i < 402) /* Need to get 400 year increments in */
- {
-
- /***** Days ******/
- tmp = *d;
- g_date_add_days(d, i);
-
- TEST("Adding days gives a value greater than previous",
- g_date_compare(d, &tmp) > 0);
-
- g_date_subtract_days(d, i);
- TEST("Forward days then backward days returns us to current day",
- g_date_get_day(d) == day);
-
- if (failed)
- {
- g_print(" (increment %u, dmy %u %u %u) ", i, day, m, y);
- g_date_debug_print(d);
- }
-
- TEST("Forward days then backward days returns us to current month",
- g_date_get_month(d) == m);
-
- if (failed)
- {
- g_print(" (increment %u, dmy %u %u %u) ", i, day, m, y);
- g_date_debug_print(d);
- }
-
- TEST("Forward days then backward days returns us to current year",
- g_date_get_year(d) == y);
-
- if (failed)
- {
- g_print(" (increment %u, dmy %u %u %u) ", i, day, m, y);
- g_date_debug_print(d);
- }
-
- /******* Months ********/
-
- tmp = *d;
- g_date_add_months(d, i);
- TEST("Adding months gives a larger value",
- g_date_compare(d, &tmp) > 0);
- g_date_subtract_months(d, i);
-
- TEST("Forward months then backward months returns us to current month",
- g_date_get_month(d) == m);
-
- if (failed)
- {
- g_print(" (increment %u, dmy %u %u %u) ", i, day, m, y);
- g_date_debug_print(d);
- }
-
- TEST("Forward months then backward months returns us to current year",
- g_date_get_year(d) == y);
-
- if (failed)
- {
- g_print(" (increment %u, dmy %u %u %u) ", i, day, m, y);
- g_date_debug_print(d);
- }
-
-
- if (day < 29)
- {
- /* Day should be unchanged */
-
- TEST("Forward months then backward months returns us to current day",
- g_date_get_day(d) == day);
-
- if (failed)
- {
- g_print(" (increment %u, dmy %u %u %u) ", i, day, m, y);
- g_date_debug_print(d);
- }
- }
- else
- {
- /* reset the day for later tests */
- g_date_set_day(d, day);
- }
-
- /******* Years ********/
-
- tmp = *d;
- g_date_add_years(d, i);
-
- TEST("Adding years gives a larger value",
- g_date_compare(d,&tmp) > 0);
-
- g_date_subtract_years(d, i);
-
- TEST("Forward years then backward years returns us to current month",
- g_date_get_month(d) == m);
-
- if (failed)
- {
- g_print(" (increment %u, dmy %u %u %u) ", i, day, m, y);
- g_date_debug_print(d);
- }
-
- TEST("Forward years then backward years returns us to current year",
- g_date_get_year(d) == y);
-
- if (failed)
- {
- g_print(" (increment %u, dmy %u %u %u) ", i, day, m, y);
- g_date_debug_print(d);
- }
-
- if (m != 2 && day != 29)
- {
- TEST("Forward years then backward years returns us to current day",
- g_date_get_day(d) == day);
-
- if (failed)
- {
- g_print(" (increment %u, dmy %u %u %u) ", i, day, m, y);
- g_date_debug_print(d);
- }
- }
- else
- {
- g_date_set_day(d, day); /* reset */
- }
-
- i += 10;
- }
-
- /***** increment test relative to our local Julian count */
-
- if (!discontinuity) {
-
- /* We can only run sequence tests between sequential years */
-
- TEST("Julians are sequential with increment 1",
- j+1 == g_date_get_julian(d));
- if (failed)
- {
- g_print("Out of sequence, prev: %u expected: %u got: %u\n",
- j, j+1, g_date_get_julian(d));
- }
-
- g_date_add_days(d,1);
- TEST("Next day has julian 1 higher",
- g_date_get_julian(d) == j + 2);
- g_date_subtract_days(d, 1);
-
- if (j != G_DATE_BAD_JULIAN)
- {
- g_date_subtract_days(d, 1);
-
- TEST("Previous day has julian 1 lower",
- g_date_get_julian(d) == j);
-
- g_date_add_days(d, 1); /* back to original */
- }
- }
- discontinuity = FALSE; /* goes away now */
-
- fflush(stdout);
- fflush(stderr);
-
- j = g_date_get_julian(d); /* inc current julian */
-
- ++day;
- }
- ++m;
- }
- g_print(" done\n");
- ++i;
- prev_y = y;
- y = check_years[i];
- if (prev_y == G_DATE_BAD_YEAR ||
- (prev_y + 1) != y) discontinuity = TRUE;
- }
-
-
- g_print("\n%u tests passed, %u failed\n",passed, notpassed);
-
- return 0;
-}
-
-