summaryrefslogtreecommitdiff
path: root/kernel/sched/deadline.c
AgeCommit message (Expand)AuthorFilesLines
2018-12-11sched/core: Remove unnecessary unlikely() in push_*_task()Yangtao Li1-3/+1
2018-12-03sched: Fix various typos in commentsIngo Molnar1-1/+1
2018-11-04sched/core: Introduce set_next_task() helper for better code readabilityMuchun Song1-9/+10
2018-10-02sched/numa: Pass destination CPU as a parameter to migrate_task_rqSrikar Dronamraju1-1/+1
2018-07-25Merge branch 'sched/urgent' into sched/core, to pick up fixesIngo Molnar1-2/+17
2018-07-25sched/deadline: Update rq_clock of later_rq when pushing a taskDaniel Bristot de Oliveira1-1/+7
2018-07-16sched/core: Use PELT for scale_rt_capacity()Vincent Guittot1-2/+0
2018-07-15sched/dl: Add dl_rq utilization trackingVincent Guittot1-0/+6
2018-07-15sched/deadline: Fix switched_from_dl() warningJuri Lelli1-1/+10
2018-05-31sched/deadline: Fix missing clock updateJuri Lelli1-3/+3
2018-05-18sched/deadline: Make the grub_reclaim() function staticMathieu Malaterre1-1/+1
2018-05-18sched/debug: Move the print_rt_rq() and print_dl_rq() declarations to kernel/...Mathieu Malaterre1-2/+0
2018-04-05sched/core: Simplify helpers for rq clock update skip requestsDavidlohr Bueso1-1/+1
2018-03-09cpufreq/schedutil: Remove unused CPUFREQ_DLPeter Zijlstra1-2/+2
2018-03-04sched/deadline, rt: Rename queue_push_tasks/queue_pull_task to create separat...Ingo Molnar1-8/+8
2018-03-04sched/headers: Simplify and clean up header usage in the schedulerIngo Molnar1-3/+0
2018-03-03sched: Clean up and harmonize the coding style of the scheduler code baseIngo Molnar1-24/+27
2018-02-21sched/isolation: Offload residual 1Hz scheduler tickFrederic Weisbecker1-0/+8
2018-02-13sched/deadline: Make update_curr_dl() more accurateWen Yang1-2/+4
2018-01-10sched/deadline: Make bandwidth enforcement scale-invariantJuri Lelli1-4/+22
2018-01-10sched/cpufreq: Change the worker kthread to SCHED_DEADLINEJuri Lelli1-30/+73
2018-01-10sched/deadline: Move CPU frequency selection triggering pointsJuri Lelli1-3/+4
2018-01-10sched/deadline: Implement "runtime overrun signal" supportJuri Lelli1-0/+7
2017-11-15Merge branch 'for-4.15' of git://git.kernel.org/pub/scm/linux/kernel/git/tj/c...Linus Torvalds1-1/+1
2017-11-08Merge branch 'linus' into sched/core, to pick up fixesIngo Molnar1-0/+1
2017-11-02License cleanup: add SPDX GPL-2.0 license identifier to files with no licenseGreg Kroah-Hartman1-0/+1
2017-10-10sched/deadline: Rename __dl_clear() to __dl_sub()Peter Zijlstra1-5/+5
2017-10-10sched/deadline: Fix switching to -deadlineLuca Abeni1-7/+4
2017-09-25cpuacct: Introduce cgroup_account_cputime[_field]()Tejun Heo1-1/+1
2017-09-08sched/deadline: replace earliest dl and rq leftmost cachingDavidlohr Bueso1-31/+19
2017-09-05Merge tag 'pm-4.14-rc1' of git://git.kernel.org/pub/scm/linux/kernel/git/rafa...Linus Torvalds1-1/+1
2017-08-10sched/deadline: Change return value of cpudl_find()Byungchul Park1-3/+3
2017-08-10sched/deadline: Make find_later_rq() choose a closer CPU in topologyByungchul Park1-13/+14
2017-08-10sched: Mark pick_next_task_dl() and build_sched_domain() as staticViresh Kumar1-1/+1
2017-08-01sched: cpufreq: Allow remote cpufreq callbacksViresh Kumar1-1/+1
2017-07-14sched/deadline: Fix confusing comments about selection of top pi-waiterJoel Fernandes1-6/+8
2017-06-23sched/deadline: Move DL related code from sched/core.c to sched/deadline.cNicolas Pitre1-0/+344
2017-06-08sched/deadline: Use the revised wakeup rule for suspending constrained dl tasksDaniel Bristot de Oliveira1-12/+86
2017-06-08sched/deadline: Zero out positive runtime after throttling constrained tasksXunlei Pang1-0/+2
2017-06-08sched/deadline: Reclaim bandwidth not used by dl tasksLuca Abeni1-15/+27
2017-06-08sched/deadline: Base GRUB reclaiming on the inactive utilizationLuca Abeni1-18/+22
2017-06-08sched/deadline: Track the "total rq utilization" tooLuca Abeni1-34/+84
2017-06-08sched/deadline: Make GRUB a task's flagLuca Abeni1-1/+2
2017-06-08sched/deadline: Do not reclaim the whole CPU bandwidthLuca Abeni1-1/+11
2017-06-08sched/deadline: Implement GRUB accountingLuca Abeni1-0/+17
2017-06-08sched/deadline: Fix the update of the total -deadline utilizationLuca Abeni1-15/+13
2017-06-08sched/deadline: Improve the tracking of active utilizationLuca Abeni1-15/+254
2017-06-08sched/deadline: Track the active utilizationLuca Abeni1-4/+61
2017-05-23sched/deadline: Remove unnecessary condition in push_dl_task()Byungchul Park1-1/+1
2017-03-16sched/deadline: Use deadline instead of period when calculating overflowSteven Rostedt (VMware)1-4/+4